The hooter requires fulltime tension on the luff, even when furled, and adds to the mast compression at all times (which is then carried to the forward beam). I also believe that the hooter can be carried a lot higher than a spinnaker and wish it would be more fair to run either (I remember a N6.0 at RTI that carried both! - that must have been a painfull portsmouth hit!).