Right, the rope starts in the horizontal position, the cleat is stopping it moving from right to left, when you pull the handle vertically, the rope is pulled from the left, as the handle is moved down, the elastic draws in the slack, then the process starts again.


John Pierce

[email]stealthmarine@btinternet.com
/email]