The boat is coming along nicely! I took the boat by a local fiberglass/boat repair shop the other day to see what they would charge me to sand the lips and glue the decks down. They quoted me $700 PER SIDE to sand them down and glue the decks on and kept telling me it would take days to sand the lips properly. One hours time, a angle grinder and several sanding discs and i was done with one side! I cant believe it only took an hour. The outside of the boat is faired and ready for paint at this point. Tonight i will sand the other side and prep for the deck installation. I have to go to the local fiberglass supplier today to pick up the Divinycell and more supplies. If i can keep this pace going this thing will be painted and floating in a month or so!