Originally Posted by Undecided
I don't know anything about the CFR20.


It's WAY (I mean like way way WAY) under the weight in this new O/F20 rule. Also, we'd have to put a jib on it. Still not sure why that is a requirement. If they left it open with only a 50m^2 limit, why not make it open to sloop or uni as well?

Originally Posted by mikekrantz
My guess it would be way overpowered upwind and scary fast downwind...


Mike, the CFR is a lot lighter than the N20c, with a taller mast and 8.5' beam. It can be controlled wink Put those beams on, it would be interesting to see how it does. I think the biggest problem would be that it's over the 50m^2 limit.