Announcements
New Discussions
Previous Thread
Next Thread
Print Thread
Rate Thread
Hop To
Spin halyard slack #247433
04/24/12 05:06 PM
04/24/12 05:06 PM
Joined: Aug 2011
Posts: 774
Greenville SC
bacho Offline OP
old hand
bacho  Offline OP
old hand

Joined: Aug 2011
Posts: 774
Greenville SC
On my N20 I have been trying to experiment with adjusting the amount of slack in the spin halyard. I have problems with retrievals as my boat had about 6' extra. When un-cleating the spin, their is plenty of slack to allow the spin to drop into the water much faster than I could ever pull the retrieval line. I have had issues trying to find a sweet spot, what is an ideal number?

Also, is there any tricks to try and make the spin start snuffing before all of the patches are tight against each other? Mine does not start drawing into the bag until there is about 1' of retrieval line still out of the snuffer.

I have a mid-pole with a separate tack-line if it matters.

--Advertisement--
Re: Spin halyard slack [Re: bacho] #247456
04/25/12 01:33 PM
04/25/12 01:33 PM
Joined: Dec 2001
Posts: 5,590
Naples, FL
waterbug_wpb Offline
Carpal Tunnel
waterbug_wpb  Offline
Carpal Tunnel

Joined: Dec 2001
Posts: 5,590
Naples, FL
tug the spin retrieval line before uncleating the spin halyard to take up the slack and keep the spin from shrimping.

If you tie a figure eight knot at a particular spot between the patches (varies between 2 and 3 patch systems) you can get the snuff started before all patches are bunched up together.

You'll have to experiment with where to put the knot, as having it in the wrong spot will keep the spin from snuffing completely.


Jay

Re: Spin halyard slack [Re: bacho] #247662
05/02/12 07:47 AM
05/02/12 07:47 AM
Joined: Sep 2009
Posts: 72
B
BadLatitude1337 Offline
journeyman
BadLatitude1337  Offline
journeyman
B

Joined: Sep 2009
Posts: 72
i run about an 8 inch pigtail on the tie off point on my kite


Open20NA 1337 FOR THE WIN!!!
Re: Spin halyard slack [Re: bacho] #253772
10/22/12 01:34 PM
10/22/12 01:34 PM

M
MN3
Unregistered
MN3
Unregistered
M



Originally Posted by bacho
Also, is there any tricks to try and make the spin start snuffing before all of the patches are tight against each other? Mine does not start drawing into the bag until there is about 1' of retrieval line still out of the snuffer.


I tie a 8" bowline knot at the top patch, and add a very small stopper ball. this ball and "loop" pulls the middle patch in ahead of the top patch. you may have to play with the correct size of the loop depending on your bag length

Re: Spin halyard slack [Re: bacho] #253782
10/22/12 04:57 PM
10/22/12 04:57 PM
Joined: May 2006
Posts: 1,383
Kingston SE South Australia
JeffS Offline
veteran
JeffS  Offline
veteran

Joined: May 2006
Posts: 1,383
Kingston SE South Australia
I'll use that tip, only thing I will add is if you tie a figure 8 as the stopper make sure it is bigger that your patch hole when tight or if it goes through the hole you cant get the spin fully up or down. Don't ask me how I know


Jeff Southall
Current boats
Nacra 5.8 1703 Animal Scanning Services
Nacra 5.8 1667 Ram Raider
Nacra 18 Square
Arrow 1576
Re: Spin halyard slack [Re: bacho] #253808
10/23/12 01:56 PM
10/23/12 01:56 PM
Joined: Nov 2005
Posts: 1,203
uk
TEAMVMG Offline
veteran
TEAMVMG  Offline
veteran

Joined: Nov 2005
Posts: 1,203
uk
Once the halyard is released and tension is on the retrieval line, the skipper need to start heading up, the blows the kite across the lee side of the boat instead of it dropping over the front


Paul

teamvmg.weebly.com

Moderated by  Damon Linkous 

Search

Who's Online Now
0 registered members (), 168 guests, and 84 spiders.
Key: Admin, Global Mod, Mod
Newest Members
Darryl, zorro, CraigJ, PaulEddo2, AUS180
8150 Registered Users
Top Posters(30 Days)
Forum Statistics
Forums26
Topics22,405
Posts267,058
Members8,150
Most Online2,167
Dec 19th, 2022
Powered by UBB.threads™ PHP Forum Software 7.7.1