here's a shot showing the tack line release trigger. The spi downhaul is fed through the small steel loop then to the pulley, when the tension is taken up on the downhaul it releases the spinlock cleet fiited under the tramp on the front beam.

Attached Files
104087-frontbeam.JPG (410 downloads)

MP*MULTIHULLS