Stitches are still in but the old arm is freeing up a bit so I've managed to get a few things done all be it slow going at the moment....
Added my usual foam stiffeners for the stringer support, only this time I made them narrower and set them in lower down the foam. Reason being, the foam is still at full height and will contact the new deck so it will provide support, the stringers will give support between the foams which the old decks didn't have.
stringers laid in place, although not seated down fully in this pic....
Interesting exercise was to measure the deflection between the hulls pre deck removal and post deck removal....
I had 36mm of flex with the old decks on, 18mm per hull. Since I've pulled the decks that figure went up to 39mm of flex so basically the old decks were only holding the hulls apart by 3mm
Yar, & this ere post be done without a sin'le drop o' rum passin' me lips
Kingy started with Impara Cadet #3 / Mosquito #245 & now Mosquitos #1182 & #1740